The Batteries Regulation calendar, as it really is
· 4 min readThree regulations have already amended the 2023 text, and several dates are not the ones people quote from memory. A re-reading of Article 96 in the version consolidated on 13 August 2026 - what already applies, what comes in 2027, what still depends on a Commission act.
The Batteries Regulation is no longer the text published in July 2023. The consolidated version available on EUR-Lex as of 13 August 2026 incorporates three amending acts and five corrigenda. Before planning anything, the dates are worth reading in that version.
The three amending acts
- Regulation (EU) 2024/1781 of 13 June 2024, on ecodesign for sustainable products, which among other things touched Article 77 on the passport.
- Regulation (EU) 2025/1561 of 18 July 2025, which postponed the supply chain due diligence obligations by two years, to 18 August 2027.
- Regulation (EU) 2026/1738 of 8 July 2026, on end-of-life vehicles, which replaced Annex I on substance restrictions, applicable since 13 August 2026.
A citation of "Regulation 2023/1542" without a consolidation date therefore does not say which text is being read.
What already applies
Article 96 sets general application at 18 February 2024. Since that date most of the regulation is in force: definitions, substance restrictions, economic operators' obligations, market surveillance.
On 18 August 2024 followed Article 17 and Chapter VI, that is the conformity assessment procedure and the notified bodies. On the same date, stationary storage systems had to hold technical documentation demonstrating the Annex V safety tests (Article 12).
18 August 2025 opened Chapter VIII: producer register, extended producer responsibility, collection, treatment. And the separate collection symbol has been mandatory on all batteries since that date (Article 13(4)).
What comes in 2026 and 2027
18 August 2026 is the date of the general information label and the capacity label (Article 13(1) to (3)), with a caveat often forgotten: the obligation applies on that date or eighteen months after the entry into force of the implementing act setting its specifications, whichever is later. The Commission was to adopt that act by 18 August 2025.
18 February 2027 is the most awaited date, and it carries two distinct obligations: the digital passport (Article 77) and the QR code on every battery (Article 13(6)). But it is also the date of Article 11, on removability and replaceability of portable and LMT batteries. Three projects, one day.
18 August 2027 is now the date of due diligence (Chapter VII), after the 2025 postponement.
What still depends on the Commission
Several obligations are dated relative to a delegated or implementing act, and slide with it. The carbon footprint declaration and the performance classes (Article 7) await their delegated acts. The minimum recycled content shares (Article 8) apply from 18 August 2031, but the calculation method awaits its own. The labelling implementing act conditions, as seen, the 2026 date.
For those obligations, the right question is not "what is the date?" but "is the act adopted?". Until it is, the regulation's date is a floor, not a deadline.
Two acts have landed: Implementing Decision (EU) 2026/2048 of 14 September 2026 cites in the Official Journal the first harmonised standard under the regulation, EN 18060:2025 on the performance and durability of road vehicle batteries; and Delegated Regulation (EU) 2026/1770, adopted on 14 July 2026 and in force since 11 November 2026, redefines the Article 11 removability derogations (wearables, toys until 2030, ATEX equipment, among others). A simplification package under negotiation may still move some dates; it is not adopted.
What this changes in a compliance plan
- Read the consolidated version, and note its date.
- Separate firm dates (February 2024, August 2024, August 2025, February 2027, August 2027) from conditional ones (labelling 2026, carbon footprint, recycled content).
- Treat 18 February 2027 as three obligations: passport, QR code, removability.
- Check, with every new act published, whether a conditional date has just been fixed.